VAR

UC Technician
Inspection cannot be completed unless As-Built drawings have been submitted. Inspection will be completed within 10 business days after receipt of drawings.
As-Built drawings submitted?
As-Built drawings complete? (locations, paths, wire #’s)
Camera on the UC approved list?
Camera properly installed?
Camera mount secure?
Wiring is CAT 6 plenum?
Wires properly concealed?
Surface wires ran in conduit?
Cables labeled on both ends?
Penetrations sealed?
Power injector properly installed & secured?
Camera properly aimed & focused?
UC Default camera login programmed on camera
UC & VAR
After camera installation is inspected and approved, VAR can schedule a time with UC technicians to program the camera into the DvTel system.

iFrame Code

Click the button below to caopy your embed snippet