UC Technician
Inspection cannot be completed unless As-Built drawings have been submitted. Inspection will be completed within 10 business days after receipt of drawings.
As-Built drawings submitted?
As-Built drawings complete? (locations, paths, wire #’s)
Approved Enclosure?
Enclosure properly installed?
Enclosure below 8’ to top?
Reader reprogrammed?
Enclosure labeled with number & UCPS sticker?
Wiring is Color coded banana peel?
Wires properly concealed?
Wires neatly routed through panel?
Cables labeled on both ends?
Penetrations sealed?
Power Supply Labeled?
Power Supply on generator circuit?
Power Supply Circuit Labeled?
Batteries installed and labeled? (record date)
UC & VAR

iFrame Code