VAR

Host?
UC Technician
Inspection cannot be completed unless As-Built drawings have been submitted. Inspection will be completed within 10 business days after receipt of drawings.
As-Built drawings submitted?
As-Built drawings complete? (locations, paths, wire #’s)
Approved Enclosure?
Enclosure properly installed?
Enclosure below 8’ to top?
Enclosure labeled with number & UCPS sticker?
Wiring is Color coded banana peel?
Wires properly concealed?
Wires neatly routed through panel?
Wiring protected (cable connectors / bushings)
Cables labeled on both ends?
Penetrations sealed?
Power Supply Labeled?
Power Supply on generator circuit?
Power Supply Circuit Labeled?
Batteries installed and labeled? (record date)
UC & VAR

iFrame Code

Click the button below to caopy your embed snippet